Compagnie Marie Chouinard
Montréal, Québec, Canada 2006-2007
YEAR
2006-2007
COST
$353,400 (specialized equipment)
PARTNERS
Atelier In Situ : Annie Lebel
Design and integration of sound systems, lighting and AV infrastructure for Baryshnikov and Esplanade studios.
Design of guide rails and switching devices for blackout curtains in dance studios as well as details for the technical grid below the structure.