Theatres >500 seats

Salle Wilfrid-Pelletier

Montréal, Québec, Canada 2014

YEAR
2014

CAPACITY
2 996 seats

COST
$1.2 M

The Gala “Spiralift” system, dating back to the1960’s, was entirely replaced with new lifts, fully motorized seating wagons and control management system. The new equipment allows for safe and user-friendly operation of platforms and seating wagons in different modes and sequences depending on the required configuration of the theatre: orchestra, show, galas, etc.

Trizart first performed an audit of the existing system and budgeted replacement of the lift, went ahead with production of drawings and specifications, evaluated potential bidder proposals and supervised installation of the new equipment.

Related Projects