Montréal Casino Cabaret
Montréal, Québec, Canada 2013-2016
YEAR
2013-2016
CAPACITY
956 seats
COST
$5.7 M (specialized equipment)
PARTNERS
Menkès Shooner Dagenais LeTourneau/BPA/NCK
image : Meyer
As a follow-up to the Casino de Montréal’s main building modernization project, Trizart Alliance was retained for the Quebec Pavilion revitalization project, which includes the design of a new transformable cabaret-style performance hall.
Trizart’s mandate was to design new modular seating arrangements, a motorized rigging system, a brand new audiovisual infrastructure ready for live broadcasts, a complete IPTV system for BOH surveillance as well as FOH digital signage (linked to the main complex system), update all lighting controls and distribution.
In addition, Trizart had the challenging task of designing the first psychoacoustic sound system in Eastern Canada. This system allows the complete acoustics of the hall to be changed, using dozens of microphones and hundreds of loudspeakers integrated into all the walls and ceilings