HEC Montréal
Montréal, Québec, Canada 2009-2014 and 2016
YEAR
2009-2014 and 2016
COST
$16 M and $3.6 M in specialized equipment
CLIENT
HEC Montréal
PARTNERS
Provencher Roy Architects
AWARD
Honour Award, Society for College and
University Planning, 2013
Trizart Alliance was mandated by HEC Montreal, the Université de Montréal’s business school, to design amphitheatres and renovate audiovisual and multimedia equipment on the 3rd and 4th floors of the Decelles Building, in collaboration with Provencher Roy Architects.
2016 Amphithéâtre Banque Nationale
Following major renovations to the Decelles Pavilion between 2009 and 2014, the emphasis was placed on interactive teaching and the integration of the latest technologies, an approach in which the project is a flagship achievement. This mandate, carried out in an occupied zone, and in a phased construction process.
Trizart Alliance was commissioned for the design and integration plans of all the scenographic, audiovisual and multimedia equipment and infrastructure of the various spaces (stage, hall, control room, adjacent rooms and peripheral premises).