Luc GélinasPartner | Director, Technical Design Group

    With over 20 years of experience working with audio, video and lighting systems, Luc contributes valuable expertise to the services offered by Trizart Alliance.

    His vast knowledge of the integration process provides an insight into the challenges and difficulties of the system integrator.

    Luc acted as project manager for the Montréal Casino’s major renovation project which included 5 gaming floor and a multifunctional hall, the Casino du Lac-Leamy renovation, the Université de Montréal’s HEC business school renovation project of 3 campus, the Montréal Cardiology Institute, Bangkok’s Iconsiam multifunctionnal Hall, the Amphithéâtre Cogeco, a 10,000-seat outdoor amphitheatre in Trois-Rivières, the Luxor Showroom in Las Vegas, Place Bell Arena , l’Agora de Québec, the Maison des arts Desjardins in Drummondville, the Centre d’arts d’Orford, Théâtre Denise-Pelletier, Théâtre de Quat’Sous, the Conservatoire de musique et d’art dramatique de Montréal and the Musée National des beaux-arts expansion in Québec City.

    Photographie Yves BouchardPhotographie Philippe Beaudoin