Museums and libraries

Canadian Museum of Human Rights

Winnipeg, Manitoba, Canada 2019-

YEAR
2019-

CAPACITY
253 seats

COST
$6 M (specialized equipment)

CLIENT
Canadian Museum of Human Rights

PARTNERS
Dialog Architecture and Engineering

The Canadian Museum of Human Rights was built from 2008 to 2014. The theatre space was never completed and remained at the basic building stage. Trizart Alliance has completed the conceptual and final design development phase for all of the technologies that will soon be added to this prestigious building. The main auditorium with a capacity of 253 seats, all designed with the utmost care for ergonomics for all types of clientele, will be equipped with telescopic risers, a motorized rigging system, technical grids, complete stage masking, a multimedia capture and diffusion system, advanced sound and lighting and a multimedia animation system, combining electro-mechanized lighting elements.

Related Projects